How long does planning permission take for an extension?

Most planning applications, including those for house extensions, are decided within 8 weeks. Unusually large or complex ones can take 13. Once granted, you generally have three years to start building.

[DRAFT - wording to be approved by the client before launch.]

What happens in the 8 weeks

  • Validation. The council first checks that the application is complete. Small applications should be validated within three to five working days. An incomplete one stops here until the missing piece arrives, which is the most common cause of delay.
  • The register. A valid application goes on the planning register with a reference number, and the clock runs from validation.
  • The decision. The council decides against its development plan and how the extension would affect the surrounding area. It does not decide on whether local people want it.

If the council cannot decide within eight weeks, it should ask for your written consent to extend the period.

What makes it quicker

  • A complete application first time: the right drawings, to scale, with everything the council's checklist asks for.
  • A design that already respects the neighbours and the street, so nobody needs to ask for changes.
  • Asking the council first, if the case is unusual. Some councils charge for pre-application advice.

How long permission lasts

Unless your permission says otherwise, you have three years from the date it is granted to begin the development. After that it expires.

If it is refused, or late

  • Refused: for a householder application you can appeal for up to 12 weeks from the date on the decision letter.
  • Late: if the council has not decided within the statutory period, you can appeal on the grounds of non-determination.
  • Often quicker than either: find out what the objection was and apply again with a design that answers it.

The part you control

The eight weeks are the council's. The time before them is yours, and it is where projects drift: months spent deciding on a design, then weeks waiting for drawings. With us the design is in front of you in minutes and the drawings take days, and if your project needs planning permission, preparing and submitting the application is an optional add-on.

The timings on this page are England's. Scotland, Wales and Northern Ireland run their own planning systems.

Common questions

How long does planning permission take for a house extension?

In most cases the council decides within 8 weeks of the application being valid.

How long does planning permission last?

Generally three years from the date it is granted. You must begin the work within that time.

Is it easy to get planning permission for an extension?

A modest extension that matches the house and leaves the neighbours their light and privacy is usually straightforward. Refusals tend to come from size, overlooking, or a design that does not suit the street.

Last reviewed .

Sources

Read next

More guides: can I extend my house?, what extension drawings cost, do I need an architect for an extension?, who can draw plans for an extension, indicative or surveyed drawings, garage conversion: planning permission, garden room: planning permission, extensions in Scotland, extensions in Wales, extensions in Northern Ireland, party wall agreements, prior approval for larger extensions, extension roof types.

See yours before you spend a penny

Tell us your address and what you have in mind, and we show you your own house with the extension on it. The renders are free, wherever you are in the UK.