How to plan an extension, step by step
Plan an extension in this order: decide what the space is for, check what you are allowed to build, see the design, get it drawn, deal with permissions and the neighbours, then get builders' prices. Most wasted money comes from doing these out of order, usually by paying for drawings before settling the design.
[DRAFT - wording to be approved by the client before launch.]
1. Decide what the space is for
A kitchen-diner, a living space, a bedroom, a home office, a utility room. The use decides where it goes, how big it needs to be, and where the doors and windows belong. Write down what is wrong with the house now; that is the brief.
2. Check what you are allowed to build
Start with can I extend my house?. It tells you whether you are likely to need a planning application or can build under permitted development, and what size that allows.
3. See it before you pay for anything
This is the step most people skip, because until recently it cost money. Give us your address, a few choices and a photo, and we show you your own house with the extension on it, free. If you do not like it, you have spent nothing.
4. Get it drawn
Drawings turn the idea into something a council can assess and a builder can price. How accurate they need to be depends on what they are for: see indicative or surveyed drawings and what extension drawings cost.
5. Sort out planning
If you need planning permission, apply. Most applications are decided within 8 weeks. If you do not, consider a lawful development certificate so you have it in writing. A larger rear extension goes through prior approval.
6. Building regulations
Separate from planning, and needed for almost every extension. They cover how it is built: structure, insulation, fire safety, drainage. In Scotland the equivalent is a building warrant, which you must have before work starts.
7. Talk to the neighbours
In England and Wales, building on or near the boundary, or digging near a neighbour's foundations, means serving a party wall notice one or two months before work starts, depending on the work. A conversation before the letter arrives is the cheapest thing you will do on the whole project.
8. Get builders' prices
Ask for prices against the same drawings, so you are comparing like with like. The more the drawings settle, the less the price can move once work has started.
How long it all takes
The render takes minutes and our drawings take days. A planning decision takes about 8 weeks once the application is valid, and a party wall notice needs up to two months. The paperwork, not the design, sets the pace, so start it early.
Common questions
What is the first step in planning an extension?
Deciding what the space is for, then checking what you are allowed to build. Both come before anyone draws anything.
Do I need drawings before I talk to a builder?
You can talk without them, but a builder cannot give a price you can rely on without drawings. A render is enough for a first conversation.
Last reviewed .
Read next
- Can I extend my house?: five checks that tell you whether a house can be extended, including one you are thinking of buying.
- How long planning permission takes: the 8-week decision, what happens during it, how long permission lasts, and your options if refused.
- Who can draw plans for an extension: the five routes to a set of extension drawings, and what each is best for.
More guides: what extension drawings cost, do I need an architect for an extension?, permitted development or planning permission, indicative or surveyed drawings, garage conversion: planning permission, garden room: planning permission, extensions in Scotland, extensions in Wales, extensions in Northern Ireland, party wall agreements, lawful development certificates, prior approval for larger extensions, extension roof types.
See yours before you spend a penny
Tell us your address and what you have in mind, and we show you your own house with the extension on it. The renders are free, wherever you are in the UK.